Mitigate Delays in Plant Startup due to Inefficient Information Handover

The transfer and validation of numerous documents across disciplines and partners cause several delays during the construction of a complex engineering asset. Choose a digital data-centric approach instead for an on-time, on budget start.

Using Common Systems Between Teams Optimises Collaboration and Cuts Time to Production.

  • Empower teams in different engineering disciplines to achieve more by working together using AVEVA's Integrated Engineering and Design Solution.
  • Allow an unrestricted digital flow of information between all project contributors throughout the project life cycle.
  • Any issues that crop up after handover can be jointly reverse engineered across functions if required, saving time with a parallel instead of a siloed approach.
Picture of Mitigate Delays in Plant Startup due to Inefficient Information Handover

Ensure Data is Correct, Complete and Compliant at Handover by Implementing Information Standards Upfront

  • AVEVA's Information Standards Management helps establish well defined Information Standards right at the beginning of the project.
  • These Information Standards can be imposed across all working relationships to ensure a consistent, compliant approach to engineering information.
  • Ensure all contractors meet the audit requirements for the project’s contractual information standards and flag deviations.
  • Use AVEVA NET to automatically extract and maintains tag-to-tag, tag-to-document, and document-to-document relationships to provide efficient navigation of the Digital Asset and aid information discovery.
Picture of Mitigate Delays in Plant Startup due to Inefficient Information Handover

Minimise Onsite Rework with Fully Integrated Design Tools that Ensure 2D and 3D Designs are Synchronized at all Times

  • AVEVA Diagrams helps generate all the project and instrumentation drawings containing all relevant tagged information.
  • With an Integrated Engineering philosophy and Everything 3D, a digital version of the asset can be created for pipelines, structural steel, equipment, cables, and instruments - this presents an accurate way to detect problems early in the process where they are easier, quicker and cheaper to fix.
Picture of Mitigate Delays in Plant Startup due to Inefficient Information Handover

Preemptively Identify Clashes with a Live Collaborative Review

  • Use AVEVA Engage’s touch and swipe functionality to review the different parameters, such as tags, equipment supplies and pipeline objects in the 3D model.
  • Supports multi-discipline decision making throughout the project or asset life cycle.
  • Establish operational readiness and ensure that safety regulations are in order.