Mitigate Delays in Plant Start-Up due to Inefficient Information Handover

The transfer and validation of numerous documents across disciplines and partners cause several delays during the construction of a complex engineering asset. Choose a digital data-centric approach instead for an on-time, on budget start.

Using Common Systems Between Teams Optimises Collaboration and Cuts Time to Production.

  • Empower teams in different engineering disciplines to achieve more by working together using AVEVA's Integrated Engineering and Design Solution.
  • Allow an unrestricted digital flow of information between all project contributors throughout the project life cycle.
  • Any issues that crop up after handover can be jointly reverse engineered across functions if required, saving time with a parallel instead of a siloed approach.
Picture of Mitigate Delays in Plant Start-Up due to Inefficient Information Handover

Ensure Data is Correct, Complete and Compliant at Handover by Implementing Information Standards Upfront

  • AVEVA's Information Standards Management helps establish well defined Information Standards right at the beginning of the project.
  • These Information Standards can be imposed across all working relationships to ensure a consistent, compliant approach to engineering information.
  • Ensure all contractors meet the audit requirements for the project’s contractual information standards and flag deviations.
  • Use AVEVA NET to automatically extract and maintains tag-to-tag, tag-to-document, and document-to-document relationships to provide efficient navigation of the Digital Asset and aid information discovery.
Picture of Mitigate Delays in Plant Start-Up due to Inefficient Information Handover

Minimise Onsite Rework with Fully Integrated Design Tools that Ensure 2D and 3D Designs are Synchronized at all Times

  • AVEVA Diagrams helps generate all the project and instrumentation drawings containing all relevant tagged information.
  • With an Integrated Engineering philosophy and Everything 3D, a digital version of the asset can be created for pipelines, structural steel, equipment, cables, and instruments - this presents an accurate way to detect problems early in the process where they are easier, quicker and cheaper to fix.
Picture of Mitigate Delays in Plant Start-Up due to Inefficient Information Handover

Preemptively Identify Clashes with a Live Collaborative Review

  • Use AVEVA Engage’s touch and swipe functionality to review the different parameters, such as tags, equipment supplies and pipeline objects in the 3D model.
  • Supports multi-discipline decision making throughout the project or asset life cycle.
  • Establish operational readiness and ensure that safety regulations are in order.